MacLeamy Curve - How BIM affects the design process

Updated: Jun 10, 2023

The use of technology has completely changed how projects are planned, carried out, and finished in the dynamic field of architecture and construction. Building information modeling (BIM) is one such technological advancement that has altered the design process. BIM adds a collaborative, information-rich, and dynamic approach to construction projects that goes beyond conventional 2D drawings.


The concept of the MacLeamy Curve, which was first presented in the Journal of Engineering, Project, and Production Management in 2012, demonstrates the significant impact that BIM has had on the design process. It emphasizes the value of early information sharing, collaboration, and equal distribution of design effort. Let's examine the MacLeamy Curve in more detail and see how BIM influences the design process to improve project outcomes.

The MacLeamy Curve: Highlighting Important Ideas

The relationship between design effort/cost and the stages of design and construction is illustrated by the MacLeamy Curve, which presents four essential concepts. Different lines are used to represent each concept, giving clear explanations of the advantages of adopting BIM.


The Red Line: Decreasing Ability to Affect Project Variables The red line represents the project team's decreasing ability to have an impact on important factors like cost, schedule, and functional capability as the project moves forward. Decisions made later in the project lifecycle are restricted by factors already in motion in traditional design processes. However, early collaboration and information sharing with BIM increases the team's capacity for deliberation and influence.


The Green Line: Escalating Costs of Changes The green line effectively illustrates how the costs of making changes rise exponentially as the project develops. Without BIM, the process of moving from design to procurement to fabrication in conventional construction projects results in increased costs when modifications are necessary. BIM, on the other hand, accelerates the design process and permits changes to be made earlier on when the cost impact is significantly lower.


The Blue Line: Design Effort Distribution in Traditional Projects The blue line depicts how design effort is typically distributed in conventional building projects, with the development of significant design information taking place during the construction document phase. Due to the lack of stakeholder collaboration, this approach frequently results in delays, rework, and increased costs. Contrarily, BIM encourages a change in the distribution of design effort by promoting early integration, documentation, and collaboration among all project participants.


The Black Line: Enhanced Collaboration and Early Decision-Making A new division of design work under a full collaboration model made possible by BIM is represented by the black line. This model begins the design process with a thorough information gathering, integration, and documentation phase. The potential costs of design changes brought on by the improper integration of design information are reduced thanks to this proactive approach, which enables stakeholders to make crucial decisions earlier.


How the Design Process is Modified by BIM:

Building information modeling has transformed the construction sector by promoting teamwork, efficiency, and cost reduction. Let's investigate how BIM affects different facets of the design process.

  1. Enhanced Collaboration and Information: Sharing BIM makes it easier for project teams, which may include architects, engineers, contractors, and facility managers, to collaborate in real time. Stakeholders can collaborate easily by using shared models and data, which helps to prevent misunderstandings and rework. With BIM, all project data, including 3D models, specifications, schedules, and cost information, is stored in a single database that is accessible to all project participants. This openness encourages transparency and guarantees that everyone is working with the most recent information. Through BIM, stakeholders can share early information to identify and resolve potential conflicts, interferences, or clashes before they turn into expensive problems during construction.

  2. Early Design Analysis and Simulation: BIM makes it possible to perform sophisticated design analyses and simulations, such as structural, energy, and lighting simulations. With the aid of this early analysis, design flaws and areas for optimization can be found, resulting in better decisions and enhanced project performance. The parametric modeling capabilities of BIM enable designers to quickly explore various design options. This iterative process enables thorough evaluation and selection of the best design solutions, taking into account a variety of elements including sustainability, usability, and aesthetics.

  3. Efficient Documentation and Coordination: The documentation and coordination issues that plague traditional construction projects frequently result in mistakes, delays, and cost overruns. By automating the creation of construction documents, BIM streamlines these procedures while lowering manual labor requirements and the chance of human error. BIM makes sure that various building systems, including HVAC, plumbing, and electrical, are coordinated and do not conflict with one another by using clash detection tools. This proactive method reduces conflicts and rework on the job site, saving time and resources.

  4. Improved Cost Estimation and Project Control: The data-rich environment of BIM makes cost estimation more precise and thorough. Project teams can produce real-time cost reports, monitor expenses, and spot potential cost-saving opportunities by integrating cost data within the BIM model. BIM helps improve project control by giving stakeholders a comprehensive understanding of the project's development and performance. Project milestones, resource usage, and budget variances are just a few examples of key performance indicators that can be effectively tracked and managed, allowing for prompt corrective action when required.

  5. Streamlined Construction and Facility Management: By giving contractors comprehensive and coordinated information, BIM makes the transition from design to construction easier. Because of the improved clarity, construction projects run more smoothly and fewer conflicts arise on the job site. As-built models from BIM are a useful tool for facility management when it comes to upkeep, remodeling, and future additions. Accessible asset data boosts facility management procedures' effectiveness, which reduces costs over the course of a building's life. Adopting Building Information Modeling (BIM) is essential for improving project outcomes and changing the design process. The MacLeamy Curve highlights the value of distributed design effort, early information sharing, and collaboration in promoting efficiency and cost optimization.


With BIM, project teams can escape the constraints of conventional design methodologies and set out on a collaborative journey where stakeholders can all contribute to decision-making, risk mitigation, and project performance. By utilizing the power of BIM, the industry can move forward with buildings that are quicker, more effective, and cost-constrained, ultimately paving the way for a future of collaborative, cross-functional teams committed to completing outstanding projects.


So, are you prepared to maximize BIM's potential and fundamentally alter how we create our built environment?