Unpopular Opinion: How BIM Technology Is Making Engineers and Architects Lazy

Updated: 7 minutes ago

In the ever-evolving world of architecture and engineering, the advent of Building Information Modeling (BIM) technology has revolutionized how professionals create and manage construction drawings. However, this technological advancement has sparked a controversial opinion: has BIM made architects and engineers lazy? This article delves into the perceived decline in drawing quality from pre-era to post-era, exploring the implications of incomplete and unconstructable drawings on the construction industry. We will examine the challenges faced by subcontractors, the increased time spent on BIM coordination, and the financial consequences of low-quality drawings, while also proposing solutions to improve the standards in the BIM era.



The Evolution of Architectural and Engineering Drawings


Pre-Era vs. Post-Era Drawings

Before the widespread adoption of BIM technology, architects and engineers relied heavily on manual drafting techniques and traditional CAD software. These methods demanded a high level of precision and attention to detail, resulting in comprehensive drawing sets that left little room for interpretation. The pre-era drawings were meticulous, thoroughly reviewed, and often included detailed annotations to guide the construction process.


Attention to Detail and Craftsmanship

In the pre-BIM era, the creation of drawings was a labor-intensive process that required a deep understanding of both design and construction. Architects and engineers would spend countless hours perfecting each line, dimension, and note, ensuring that every aspect of the drawing was clear and constructable. This meticulous approach resulted in drawings that were not only accurate but also rich in detail, providing a solid foundation for the construction phase.


Transition to Digital Tools

The introduction of Computer-Aided Design (CAD) software marked the beginning of a significant shift in the architectural and engineering fields. CAD tools allowed for faster and more precise drawing creation, reducing the time required to produce detailed plans. However, even with CAD, the emphasis on thoroughness and accuracy remained high, as the software was primarily an enhancement to the manual drafting skills that professionals had honed over years of practice.


The Rise of BIM Technology

Building Information Modeling (BIM) technology was heralded as a game-changer for the construction industry, promising improved collaboration, efficiency, and accuracy. BIM's ability to create 3D models that integrate various aspects of a project, from structural elements to electrical systems, has undoubtedly transformed the design process. With BIM, architects and engineers can visualize the entire project in a virtual environment, identifying potential issues before they arise on-site.


Enhanced Visualization and Integration

One of the key advantages of BIM is its ability to provide a comprehensive, integrated model that includes all relevant information about a project. This enhanced visualization allows for better coordination between different disciplines, reducing the likelihood of conflicts and errors during construction. The integrated nature of BIM models means that changes made in one area automatically update related components, ensuring consistency across the entire project.


Challenges and Dependencies

However, this technological leap has also brought about a dependency on digital tools, sometimes at the expense of traditional drafting skills and attention to detail. The ease of making changes and generating models in BIM has inadvertently contributed to a culture of expediency, where drawings may not be as thoroughly vetted as before. As a result, the quality of drawings has become a contentious issue, with some professionals arguing that the reliance on BIM has led to a decline in the meticulousness that once characterized architectural and engineering drawings.


The transition to BIM has also changed the way architects and engineers approach their work. In the past, the creation of construction documents was seen as a craft, requiring a deep understanding of building techniques and an unwavering commitment to quality. Today, the focus has shifted towards leveraging technology to streamline the design process, often at the cost of the detailed craftsmanship that defined the pre-BIM era.

The Impact of BIM Technology on Drawing Quality


Decreased Level of Detail

One of the most significant criticisms of post-era drawings is the noticeable decrease in the level of detail. The shift from manual to digital drafting has led some architects and engineers to rely heavily on software capabilities, potentially neglecting the nuances that were once meticulously captured in hand-drawn plans. This reduction in detail can result in incomplete and ambiguous construction documents, leading to confusion and misinterpretation on-site.


The Role of Automation

BIM technology automates many aspects of the design process, which, while increasing efficiency, can sometimes lead to a reduction in the level of scrutiny applied to each element of the drawing. Automated features, such as clash detection and automated dimensioning, can give a false sense of completeness, leading professionals to overlook critical details that would have been manually checked in the past. This reliance on automation can result in drawings that are less detailed and more prone to errors.


The 50% CD Level Phenomenon

The trend of presenting 50% Construction Document (CD) level drawings as 100% CD level has become a point of contention within the industry. This practice can lead to numerous issues during the construction phase, as subcontractors and other stakeholders rely on these documents to execute their work. When drawings are incomplete or lack critical information, it places a burden on the construction team to fill in the gaps, often leading to delays and increased costs.


Implications for Project Execution

When construction documents are issued at a 50% CD level, they often lack the necessary details for accurate cost estimation and project planning. Subcontractors must make assumptions and estimates based on incomplete information, increasing the risk of errors and miscommunications. This can lead to a cascade of issues during construction, including the need for numerous revisions, increased coordination efforts, and the potential for significant project delays.


Over-Reliance on BIM Tools

The ease of making changes in a BIM environment has also led to a culture where less emphasis is placed on getting things right the first time. Because updates and modifications can be made quickly and efficiently, there is a tendency to defer thorough checking and validation to later stages of the project. This approach can lead to a backlog of unresolved issues that only become apparent during the construction phase, necessitating last-minute changes and potentially compromising project quality.


Impact on Professional Standards

The reliance on BIM tools has also influenced the professional standards and expectations within the industry. The traditional skills of hand-drawing and meticulous detailing are being overshadowed by a focus on software proficiency. While BIM proficiency is undoubtedly valuable, the loss of traditional drafting skills can result in a workforce that is less equipped to produce high-quality, detailed construction documents. This shift in professional competencies can have long-term implications for the industry, potentially leading to a decline in overall project quality and constructability.


To mitigate the impact of decreased drawing quality, it is essential to implement robust quality control and assurance processes. Regular reviews and audits of BIM models and construction documents can help identify and address issues before they escalate. Ensuring that all team members are trained to understand the importance of detail and accuracy, even in a digital environment, is crucial to maintaining high standards in construction documentation.

Challenges in Construction Due to Incomplete Drawings


Subcontractors' Struggles

Subcontractors are at the forefront of the challenges posed by incomplete drawings. When architects and engineers provide drawings that lack critical details, subcontractors are forced to make assumptions about the design and construction requirements. This guessing game can lead to significant discrepancies between what is planned and what is actually built.


Bidding on Incomplete Documents

Bidding on projects with incomplete construction documents is a risky endeavor. Subcontractors must estimate their costs based on the limited information available, which can lead to either overly conservative bids that inflate project costs or underbids that result in financial losses when unforeseen issues arise. This uncertainty can make it difficult for subcontractors to provide accurate and competitive bids, ultimately affecting the overall budget and schedule of the project.


Coordination Challenges

Inadequate drawings necessitate constant communication and coordination between subcontractors, architects, and engineers to resolve ambiguities. This process can be time-consuming and often results in numerous revisions and rework. The increased need for coordination not only delays the project but also increases labor costs as subcontractors spend more time clarifying details and resolving conflicts.


Increased BIM Coordination Time

The incomplete nature of many BIM-generated drawings has led to a significant increase in BIM coordination time. Coordination meetings, which aim to resolve conflicts and ensure that all aspects of the design are aligned, become lengthier and more frequent. The time spent on these activities detracts from actual construction work, delaying project timelines and increasing labor costs. This extended coordination effort is a direct result of the lower quality and completeness of the drawings provided by architects and engineers.


Clash Detection and Resolution

One of the advantages of BIM technology is its ability to detect clashes between different building systems. However, when drawings are incomplete or lack detail, the clash detection process can become more complex and time-consuming. Subcontractors and construction teams must spend additional time identifying and resolving conflicts that should have been addressed during the design phase. This added complexity can slow down the construction process and lead to delays.


Increased Design Revisions

Incomplete drawings often result in a higher number of design revisions. As construction progresses and discrepancies are discovered, architects and engineers must update the drawings to reflect the necessary changes. Each revision requires additional review and approval, further delaying the project. The iterative nature of this process can lead to a cycle of continuous changes, increasing the overall project timeline and costs.


Impact on Construction Quality

The quality of construction can also be adversely affected by incomplete drawings. When subcontractors are forced to make on-site decisions without clear guidance, there is a higher risk of errors and inconsistencies. These mistakes can compromise the structural integrity and aesthetic quality of the building, leading to potential safety issues and increased maintenance costs in the future.


Pressure on Project Managers

Project managers are often caught in the middle of the challenges posed by incomplete drawings. They must balance the demands of the construction schedule, budget constraints, and the need to maintain high-quality standards. The additional coordination and revision efforts required to address incomplete drawings can place significant pressure on project managers, increasing the likelihood of project delays and cost overruns.


To mitigate the challenges posed by incomplete drawings, it is essential to implement strategies that enhance the quality and completeness of construction documents. This includes adopting robust quality control processes, fostering better collaboration between design and construction teams, and leveraging technology to improve detail and accuracy. By addressing the root causes of incomplete drawings, the construction industry can reduce the risks and inefficiencies associated with current practices.

The Cost of Low-Quality Drawings


Change Orders and Project Delays

One of the most tangible impacts of low-quality drawings is the proliferation of change orders. When construction documents are incomplete or inaccurate, changes must be made on the fly to address the discrepancies. Each change order represents a deviation from the original plan, often requiring additional materials, labor, and time. These changes can cascade, causing significant project delays and cost overruns. The cumulative effect of numerous change orders can severely impact the project's overall budget and schedule.


The Nature of Change Orders

Change orders are issued when deviations from the original construction documents are identified. These deviations can arise from various factors, including design errors, omissions, or unforeseen site conditions. In many cases, incomplete drawings are the primary culprit, as they fail to provide the necessary level of detail for accurate construction. Each change order requires a formal process of review, approval, and implementation, which can disrupt the workflow and lead to additional administrative burdens.


Financial Implications

The financial implications of change orders are significant. Each change order typically involves additional costs for materials, labor, and equipment. These costs can quickly accumulate, leading to substantial budget overruns. Moreover, the delays caused by change orders can extend the project timeline, resulting in increased indirect costs such as extended site supervision, prolonged equipment rentals, and additional overheads. For project owners, these financial setbacks can erode the return on investment and strain project funding.


Disputes and Litigation

The prevalence of change orders due to low-quality drawings can also lead to disputes and litigation. When projects experience significant delays and cost overruns, stakeholders may resort to legal action to recover their losses. These disputes can be costly and time-consuming, further straining project resources and relationships. The root cause of many of these disputes is often traced back to the inadequacies in the initial construction documents.


Financial Implications for Stakeholders

The financial implications of low-quality drawings extend beyond the immediate costs of change orders and delays. Stakeholders, including project owners, contractors, and subcontractors, all bear the brunt of these inefficiencies. For project owners, the increased costs and extended timelines can erode the project's return on investment. Contractors and subcontractors may face financial strain from unanticipated expenses and resource allocation challenges. The reputational damage resulting from project mismanagement can also impact future business opportunities.


Project Owners' Perspective

For project owners, low-quality drawings can translate into substantial financial losses. The initial budget for a project is often based on the assumption that the construction documents are accurate and complete. When this assumption proves to be false, project owners must allocate additional funds to cover the unexpected costs. This can result in budgetary constraints, delayed payments, and potential funding shortfalls. In extreme cases, the financial burden of addressing low-quality drawings can jeopardize the viability of the entire project.


Contractors' and Subcontractors' Perspective

Contractors and subcontractors are equally affected by the financial implications of low-quality drawings. The need for frequent revisions and change orders disrupts the construction schedule, leading to inefficiencies and increased labor costs. Additionally, contractors and subcontractors may be required to purchase additional materials or reallocate resources to address unforeseen issues. These unplanned expenses can strain their financial stability and impact their ability to meet other project commitments.


Long-Term Impact on Relationships

The long-term impact of low-quality drawings on stakeholder relationships cannot be underestimated. When projects are plagued by delays and cost overruns, trust between stakeholders can be severely damaged. Project owners may lose confidence in their contractors and design teams, while contractors may become wary of collaborating with certain architects or engineers. This erosion of trust can hinder future collaboration and limit opportunities for repeat business.


Financial Strategies for Mitigation

To mitigate the financial impact of low-quality drawings, stakeholders must adopt proactive financial strategies. This includes setting aside contingency funds to cover unexpected costs, negotiating flexible contract terms that address potential changes, and conducting thorough financial planning and risk assessments. By anticipating the financial challenges associated with low-quality drawings, stakeholders can better manage their resources and minimize the impact on project outcomes.


The cost of low-quality drawings is a significant issue that affects all stakeholders in the construction industry. From increased change orders and project delays to financial losses and damaged relationships, the repercussions are far-reaching. To address these challenges, it is essential to improve the quality and completeness of construction documents through enhanced training, better collaboration, and robust quality control processes. By doing so, the industry can reduce the financial burden of low-quality drawings and ensure more successful project outcomes.

Solutions to Improve Drawing Quality in the BIM Era


Enhancing Training and Standards

To address the decline in drawing quality, it is crucial to enhance training and establish higher standards for architects and engineers. Comprehensive training programs that emphasize the importance of detail and accuracy in construction documents can help professionals develop the necessary skills to produce high-quality drawings. Additionally, industry standards should be updated to reflect the evolving capabilities of BIM technology while maintaining a focus on thoroughness and constructability.


Regular Field Visits

One of the most effective ways to improve the quality of drawings is by having new architects and engineers conduct regular field visits. By seeing how their drawings are used to convert blueprints into reality, they can gain a deeper understanding of the practical aspects of construction. Observing the challenges and nuances of the building process firsthand allows them to create more accurate and constructable drawings. These field experiences provide invaluable insights that can be applied to improve the quality and practicality of their work.


Active Participation in BIM Coordination

Architects and engineers should actively participate in the BIM coordination process. By being directly involved in the coordination meetings and clash detection sessions, they can better understand the complexities and interdependencies of different building systems. This active participation ensures that they are aware of potential issues and can address them early in the design phase, leading to more comprehensive and constructable drawings. Engagement in the BIM process fosters a collaborative environment, improving communication and reducing the likelihood of errors.


Internship Collaboration with Subcontractors and General Contractors

Engineering and architectural firms should establish internship programs that collaborate with subcontractors and general contractors. New hires can work alongside project managers and superintendents on the field, gaining practical experience and insights into the construction process. These internships provide hands-on learning opportunities, allowing new professionals to understand the real-world application of their drawings. By working closely with experienced field personnel, they can develop a more practical and grounded approach to their design work, resulting in higher-quality construction documents.


Improving Quality Control Processes

Implementing robust quality control processes is essential to maintaining high standards in construction documentation. Regular reviews and audits of BIM models and construction documents can help identify and address issues before they escalate. Ensuring that all team members are trained to understand the importance of detail and accuracy, even in a digital environment, is crucial to maintaining high standards in construction documentation.


Quality Assurance (QA) and Quality Control (QC)

Quality Assurance (QA) and Quality Control (QC) processes are vital for ensuring the accuracy and completeness of construction documents. QA involves establishing procedures and standards for creating and reviewing drawings, while QC focuses on the actual inspection and verification of the documents. By implementing a structured QA/QC program, organizations can systematically check for errors, omissions, and inconsistencies in their BIM models and drawings. This program should include regular peer reviews, automated model checks, and detailed manual inspections to ensure that all aspects of the construction documents are thoroughly vetted.


Third-Party Reviews

Engaging third-party reviewers can provide an additional layer of quality control. Independent reviewers can offer an unbiased perspective and identify issues that internal teams might overlook. These reviewers should be experienced professionals with a deep understanding of BIM technology and construction practices. Their feedback can help ensure that the final drawings are accurate, detailed, and constructable, reducing the risk of errors and discrepancies during construction.


Emphasizing Constructability

Focusing on constructability during the design phase is crucial to improving drawing quality. Architects and engineers must consider how their designs will be built, ensuring that all elements of the construction documents are practical and feasible. This includes detailing how different building systems will be installed, accounting for site conditions, and considering the sequencing of construction activities. By prioritizing constructability, professionals can create drawings that are not only accurate but also actionable, reducing the likelihood of issues arising during construction.


Constructability Reviews

Conducting constructability reviews during the design phase can help identify potential issues before they impact construction. These reviews should involve experienced construction professionals who can provide insights into the practical aspects of building the design. By incorporating their feedback, architects and engineers can make necessary adjustments to the drawings, ensuring that they are comprehensive and constructable. Regular constructability reviews can help catch issues early, reducing the risk of costly changes and delays during construction.


Leveraging Technology for Improved Detail

While BIM technology can sometimes contribute to a decline in drawing quality, it also offers powerful tools for improving detail and accuracy. By leveraging advanced features such as clash detection, automated dimensioning, and parametric modeling, professionals can create more detailed and precise construction documents. These tools can help identify potential issues early in the design phase, allowing for adjustments to be made before construction begins. By using technology to enhance detail and accuracy, the industry can improve the overall quality of construction documents.


FAQs


What is the main issue with current architectural and engineering drawings?

The main issue is the perceived decline in the quality and level of detail in drawings, which are often incomplete and unconstructable, leading to inefficiencies and increased costs in construction projects.


How does BIM technology contribute to this problem?

BIM technology, while powerful, has led to a reliance on digital tools that can result in less meticulous and thorough drawings. This shift has contributed to the trend of presenting incomplete documents as final deliverables.


Why are subcontractors struggling with current drawing standards?

Subcontractors face difficulties because incomplete drawings require them to anticipate and address numerous uncertainties, leading to either inflated bids or financial strain from unanticipated issues.


What are the financial implications of low-quality drawings?

Low-quality drawings can result in numerous change orders, project delays, and increased costs, impacting the financial health of all stakeholders involved in a construction project.


How can drawing quality be improved in the BIM era?

Improving drawing quality requires enhanced training for architects and engineers, updated industry standards, and better collaboration between design and construction teams.


What role does collaboration play in improving drawing quality?

Collaboration ensures that potential issues are identified and resolved early in the design phase, leading to more comprehensive and actionable final drawings.


While BIM technology has revolutionized the construction industry, it has also introduced challenges that cannot be ignored. The decline in drawing quality and the trend of presenting incomplete documents as final deliverables have significant implications for project success. By enhancing training, updating industry standards, and fostering better collaboration, the construction industry can address these issues and ensure that the promise of BIM technology is fully realized without compromising the quality of architectural and engineering drawings.